Essers

Essers

Especially on longer routes, pharmaceutical goods present considerable challenges. Vaccines, for example, require a constant temperature of between 2°C and 8°C – which is not easily maintained on transport flights stretching across entire continents. “Vaccines have a...
MADE by Bosch Rexroth

MADE by Bosch Rexroth

Problem Statement Complex Assembly: The valve assembly process was intricate, leading to extended training periods for operators. Training Delays: Prolonged training times hindered swift adaptation to new products and processes. Manual Errors: Manual errors were...
Benteler

Benteler

Problem Statement At the Benteler facility in Klášterec nad Ohří, Czech Republic, operators faced challenges in loading carts with poles in a specific location to secure plates during pressing operations. The key problems identified were: Loading Cart with Poles:...
Webasto

Webasto

Problem Statement: Webasto faced several challenges in their rooftop assembly process, which required attention to ensure quality, safety, and operational efficiency. The key problems identified were: Multiple Product Variants: With a wide range of product variants,...
Alro

Alro

Problem Statement: WCA-Alro faced several challenges in their bumper/stossfanger assembly process, which required attention to ensure accuracy, efficiency, and quality. The key problems identified were: 1. Drilling Location Variations: The drilling location of license...